CUZIPLYFactory-direct plywood
Get a quote
CONSTRUCTION PLYWOOD / APPLICATION GUIDEWALL · ROOF · SUBFLOOR · BRACING

Choose Construction Plywood by Sheathing, Subfloor and Roof Duty

CUZI PLY construction plywood is specified for wall sheathing, roof decking, subfloors, bracing and selected engineered components by matching the panel to the complete assembly. Define loads, spans, support centres, face-grain direction, joints, openings, fixings and exposure first; then confirm structural grade, veneer construction, bond class, thickness, dimensions, tolerances and an agreed moisture target. We coordinate the selected panel and shipment documents with the project specification so purchasing, installation and inspection teams work from the same requirements.

  • Wall, roof and subfloor panel selection
  • Structural grade and bond-class coordination
  • 8–12% typical shipment moisture target
  • Cut-to-size, packing and phased delivery
Applications
Sheathing, roof decking, subfloor and bracing
Panel selection
Structural Plywood or project-specified construction
Common formats
1220 × 2440 mm, 1250 × 2500 mm and project sizes
Specify together
Grade, thickness, orientation, supports, fixings and exposure
QUICK SELECTION

Start with the assembly that the panel must support.

The same plywood thickness can perform differently when support spacing, face-grain direction, edge support, openings or fixings change.

Wall sheathing

Transfers the project wall actions through the panel field, supported edges, fasteners and framing.

Confirm
Stud spacing, blocked joints, openings, face-grain direction, fixing schedule, exposure and cladding sequence
Recommended panel
Structural Plywood

Roof sheathing

Forms the designed roof deck or diaphragm over rafters or trusses and beneath the specified roof build-up.

Confirm
Support spacing, edge support, roof slope, construction wetting, underlay, ventilation and fastening
Recommended panel
Structural Plywood; Marine option when the project specifically requires it

Subfloor

Carries the designed floor actions and provides the required substrate for the finished floor system.

Confirm
Joist layout, concentrated loads, tongue-and-groove or blocked edges, moisture, deflection and finish
Recommended panel
Structural Plywood

Bracing and diaphragms

Connects the panel field to scope members, collectors and hold-downs in the lateral-force system.

Confirm
Declared properties, scope members, collectors, hold-downs, openings and fastening schedule
Recommended panel
Structural Plywood with project-declared properties
PROJECT INPUTS

Give us enough detail to quote the correct construction.

These inputs connect product selection, cutting, packing and documents to the current project drawings.

  1. 01

    Building and assembly

    State the building type and whether the panel serves wall sheathing, roof decking, subfloor, bracing, lining or an engineered component.

    Application brief
  2. 02

    Design responsibility

    Identify the structural engineer, system designer, installer and purchasing contact for the project.

    Responsibility schedule
  3. 03

    Loads and serviceability

    Provide gravity, wind, lateral and concentrated actions together with span, deflection and vibration criteria.

    Design-input summary
  4. 04

    Support layout

    Show joists, studs, rafters, blocking, bearing widths, support centres and every supported panel edge.

    Support drawing
  5. 05

    Panel orientation

    State the face-grain direction required by the structural calculation and installation drawing.

    Orientation detail
  6. 06

    Panel joints

    Define supported edges, tongue-and-groove or blocked joints, expansion allowance and joint treatment.

    Joint detail
  7. 07

    Fixing schedule

    Specify fastener type, material, corrosion protection, edge distance, field spacing, perimeter spacing and seating.

    Fixing plan
  8. 08

    Openings and penetrations

    Map windows, doors, services, penetrations, trimmed edges and their framing requirements.

    Opening schedule
  9. 09

    Exposure stage

    Describe expected construction wetting and the final dry, humid, protected-exterior or exterior service condition.

    Exposure statement
  10. 10

    Bond and product standard

    Name the plywood bond class, structural standard, grade or declared-property option required for the project.

    Product requirement
  11. 11

    Weather protection

    Define wrapping, underlay, membranes, flashings, ventilation, drainage and the drying sequence.

    Protection detail
  12. 12

    Edge treatment

    State the treatment for factory edges, site cuts, holes, notches and damaged corners.

    Edge-protection detail
  13. 13

    Dimensions and moisture

    Confirm nominal thickness, finished sheet size, tolerance, conditioning and the agreed shipment moisture range.

    Purchase dimensions
  14. 14

    Performance criteria

    List structural, fire, acoustic, thermal, emission and appearance requirements that affect panel selection.

    Performance schedule
  15. 15

    Destination and project standard

    Name the destination country, project specification, design code and approving project party.

    Standards list
  16. 16

    Inspection points

    Define checks at delivery, first installation, after weather exposure and before the assembly is covered.

    Inspection plan
  17. 17

    Quantity and delivery sequence

    State total volume, first shipment, phased deliveries, site storage limits and replenishment dates.

    Supply schedule
  18. 18

    Drawings and documents

    Provide the current drawing revision, approved sample requirements, product documents and change procedure.

    Project document list
CONSTRUCTION DETAIL

Wall sheathing works through framing, supported edges, openings and fasteners.

Timber wall frame with plywood sheathing joints fully supported around a framed opening during installation
Plywood in useCoordinate stud spacing, panel orientation, blocking, window and door openings, perimeter fixings and the cladding sequence in the wall drawing.
APPLICATION COMPARISON

Match plywood construction to the duty, supports and installation method.

Construction plywood application comparison
AssemblyRequired performanceInputs to confirmPanel selectionProject leadSelection focus
Wall sheathingTransfers the project wall actions through the panel field, supported edges, fasteners and framing.Stud spacing, blocked joints, openings, face-grain direction, fixing schedule, exposure and cladding sequenceStructural PlywoodEngineer / wall-system designerSelect grade, thickness, orientation and fixings from the complete wall design.
Roof sheathingForms the designed roof deck or diaphragm over rafters or trusses and beneath the specified roof build-up.Support spacing, edge support, roof slope, construction wetting, underlay, ventilation and fasteningStructural Plywood; Marine option when the project specifically requires itRoof designer / engineerMatch panel span capability and connection details to the roof calculation.
SubfloorCarries the designed floor actions and provides the required substrate for the finished floor system.Joist layout, concentrated loads, tongue-and-groove or blocked edges, moisture, deflection and finishStructural PlywoodFloor designer / engineerCoordinate panel grade with joist layout, joints, openings and floor-finish requirements.
Bracing and diaphragmsConnects the panel field to scope members, collectors and hold-downs in the lateral-force system.Declared properties, scope members, collectors, hold-downs, openings and fastening scheduleStructural Plywood with project-declared propertiesStructural engineerUse the project calculation to set racking resistance and fixing centres.
Engineered componentsProvides a specified plywood input for fabricated webs, gussets, box elements or other calculated components.Component drawing, machining, stress direction, bonding, inspection and traceabilityStructural Plywood or a project-qualified constructionComponent designer / fabricatorQualify the finished component with its actual machining, bonding and load direction.
Industrial liningCombines structural support with the nominated impact, cleaning, fire or service-exposure requirements.Support, impact duty, exposed edges, finish, cleaning and fire requirementsStructural, Fire-Retardant or treated option matched to the specificationProject specifierCoordinate structural performance with the visible finish and service environment.
Temporary protectionProvides a designed temporary deck, barrier or opening cover for a stated period and access duty.Duration, pedestrian or plant access, support, restraint, weather and removal planCommercial or Structural Plywood matched to the temporary-works designSite temporary-works responsible partySet panel and support requirements from the site-specific temporary duty.
LOAD PATH

Connect the panel field to joints, fasteners, framing and the primary structure.

The project engineer uses the selected panel properties and assembly geometry to set spans, loads and fixing centres.

Applied action

Project role
Project engineer
Design input
Issue dead, live, wind, construction and concentrated actions.
Project document
Approved design basis

Panel field

Project role
Panel supplier + engineer
Design input
Match construction and declared properties to the calculation.
Project document
Product data and shipment documents

Panel edge / joint

Project role
System designer
Design input
Provide bearing, blocking or an engineered edge connection where required.
Project document
Joint detail

Fastener

Project role
System designer + installer
Design input
Select type, corrosion option, spacing, edge distance and installation control.
Project document
Fixing schedule and site record

Framing member

Project role
Structural designer
Design input
Confirm member size, stability, moisture condition and connection path.
Project document
Framing calculation

scope / collector

Project role
Structural engineer
Design input
Carry accumulated actions around openings and into the resisting system.
Project document
scope-member detail

Foundation / primary frame

Project role
Project engineer
Design input
Complete the load path beyond the plywood assembly.
Project document
Project structural documents
PRODUCT & SPECIFICATION GUIDES

Choose the related product or guide that matches the project requirement.

Structural Plywood

Use this option for panels supplied with a named structural standard, grade identity and declared properties.

Specify
Grade, lay-up, face-grain direction, dimensions, tolerances, moisture and project documents
Use together with
Combine the product specification with the engineer's spans, joints, openings and fixing design.
View guide

Marine Plywood

Use this option where the project calls for a defined marine construction and high-quality veneer and bond requirements.

Specify
Marine standard, veneer quality, core construction, bond class and finishing system
Use together with
Pair the marine panel with drainage, ventilation, coating, sealing and maintenance details.
View guide

Pressure-Treated Plywood

Use this option where the project hazard or use class requires preservative-treated plywood.

Specify
Treatment system, penetration or retention, post-treatment dimensions, moisture and compatible fasteners
Use together with
Coordinate treatment with the structural grade, connection design and building-envelope details.
View guide

Fire-Retardant Plywood

Use this option where a named reaction-to-fire or assembly fire requirement forms part of the specification.

Specify
Test method, classification, treated construction, finish, mounting and report scope
Use together with
Match the supplied panel and installed build-up to the tested or classified configuration.
View guide

T1-11 Grooved Plywood Siding

Use this option when the plywood is the visible grooved exterior siding rather than concealed sheathing.

Specify
Groove geometry, structural grade, coating, flashing, fixing and installation details
Use together with
Specify the structural contribution and exterior-finish performance as coordinated project requirements.
View guide

Plywood Sizes & Thicknesses

Use the size guide to convert framing modules and cutting plans into efficient purchasable sheet formats.

Specify
Finished size, thickness, tolerance, machining allowance, orientation and support geometry
Use together with
Select the final format together with the required grade and calculated span capability.
View guide

Standards & Certifications

Use the standards guide to align the product, destination market and project-document package.

Specify
Designation, edition, scope, marking or report status and the document required at shipment
Use together with
Connect product standards, design rules and project approvals in the purchasing specification.
View guide

How to Specify Plywood

Use the specification guide to turn drawings and performance criteria into a complete RFQ.

Specify
Application, construction, dimensions, performance, documents, sample and change procedure
Use together with
Keep the purchase specification aligned with the current structural drawings.
View guide

Plywood Grades, Cores & Bonds

Use this guide to define appearance grade, veneer species, core quality and bond terminology.

Specify
Face and back grade, core identity, veneer lay-up, bond class and applicable test method
Use together with
Combine grade, core and bond with the structural option required by the project.
View guide
CONSTRUCTION DETAIL

Subfloor performance begins with joist layout, supported joints and framed openings.

Plywood subfloor panels placed perpendicular to supported timber joists around a framed service opening
Plywood in useCoordinate joist spacing, tongue-and-groove or blocked edges, service openings, concentrated loads, moisture and the finished-floor interface.
MOISTURE & WEATHER PROTECTION

Coordinate bond class, drainage, ventilation and edge protection as one system.

Moisture and assembly-protection guide
ConditionProtection methodPanel specificationInstallation check
Dry internal serviceKeep panels dry during transport, storage and installation, then complete the building enclosure on schedule.Specified structural grade, bond class and shipment moisture rangeCheck moisture, flatness, edges, supports and fixings before covering.
Construction wettingLimit exposure time, shed standing water, ventilate the assembly and allow panels to dry to the project criterion.Bond and exposure class matched to the expected construction periodCheck edge condition, flatness and measured moisture after the wetting event.
Humid or protected external serviceCoordinate membranes, flashings, cavities, ventilation and sealed edges as one protected assembly.Panel exposure class and bond specifications selected for the stated service conditionCheck laps, penetrations, drainage paths and ventilation before covering.
Direct exterior exposureUse a panel, coating or treatment system specifically selected for direct weathering and planned maintenance.Exterior-use panel specification together with coating, treatment and system documentsInspect surface, edges, fasteners, drainage and maintenance access at completion.
Site cuts and penetrationsClean and dry exposed veneers, then apply the specified compatible edge-protection system at cuts, holes and notches.Coating or treatment compatibility and application instructionsCheck coverage and cure before the detail is covered.
Site storageStore packs flat, off the ground and on aligned bearers; protect against rain while maintaining ventilation and drainage.Delivery condition, bearer spacing, cover method and storage durationInspect geometry, trapped moisture and handling damage before installation.
Wetting, warp or edge swellingSeparate affected sheets, remove water, dry them evenly and assess flatness and edge condition against project criteria.Product identity plus the agreed moisture, flatness and edge-acceptance limitsThe project team assigns each affected sheet for use, repair or replacement.
PROJECT WORKFLOW

Move from application brief to installation inspection in twelve clear steps.

  1. 01

    Define the application

    State the wall, roof, subfloor, bracing, lining or component duty and identify the project designer.

  2. 02

    Provide design inputs

    Share loads, span, support, deflection, vibration and serviceability criteria.

  3. 03

    Map supports and openings

    Locate framing, blocking, supported edges, penetrations, scope limits and collectors.

  4. 04

    Define exposure

    Describe construction wetting, final service conditions, drainage, ventilation and protection.

  5. 05

    Select the panel constructions

    Choose Structural, Marine, Pressure-Treated, Fire-Retardant or another project-specified construction.

  6. 06

    Confirm standards

    Name the product standard, design code, grade, declared properties and required documents.

  7. 07

    Confirm dimensions

    Set face-grain direction, thickness, finished size, tolerance, moisture and machining requirements.

  8. 08

    Coordinate interfaces

    Complete joint, fixing, membrane, flashing, penetration and edge-protection details.

  9. 09

    Approve the sample and first lot

    Check panel identity, construction, dimensions, moisture, appearance and accompanying documents.

  10. 10

    Install to the drawing

    Follow the project details and capture changes, repairs, cuts and significant weather events.

  11. 11

    Inspect before covering

    Check supports, joints, fastening, moisture, membranes, edges and panel identity.

  12. 12

    Complete the inspection

    Correct outstanding items and obtain project acceptance before the assembly is covered.

CONSTRUCTION DETAIL

Roof sheathing combines panel selection with support, fixing and weather sequencing.

Plywood roof sheathing installed over a supported timber roof frame with scaffold and fall protection
Plywood in useCoordinate rafters or trusses, edge support, face-grain direction, fasteners, temporary protection, underlay, ventilation and drainage.
STANDARDS & DOCUMENTS

Match the product standard, design code and shipment documents to the destination.

Standard reference 01

BS EN 636:2012+A1:2015

Plywood specifications for dry, humid and exterior conditions

Issued by
BSI
Published status
Current
Application
European plywood classification by intended service condition when specified.
Coordinate with
Coordinate with the structural calculation, span, support and fixing schedule.
View source
Standard reference 02

BS EN 13986:2004+A1:2015

Wood-based panels for use in construction

Issued by
BSI
Published status
Current; confirm the applicable project edition
Application
Construction-product characteristics and conformity option for the stated European scope.
Coordinate with
Specify the exact structural plywood construction and declared characteristics.
View source
Standard reference 03

BS EN 314-1:2004 / BS EN 314-2:1993

Plywood bonding test methods and requirements

Issued by
BSI
Published status
Current; confirm the applicable part and edition
Application
Bond test and requirement option for the nominated plywood construction.
Coordinate with
State the method and bond class in place of general WBP wording.
View source
Standard reference 04

BS EN 1995-1-1:2025

Eurocode 5 timber-structure design rules

Issued by
BSI
Published status
Current; national transition applies
Application
European timber-structure design option used by the responsible engineer.
Coordinate with
Pair with the relevant national provisions and product-property documents.
View source
Standard reference 05

AS/NZS 2269.0:2012 Amd 1:2015

Structural plywood specifications

Issued by
Standards Australia
Published status
Current
Application
Australia and New Zealand structural-plywood product options where specified.
Coordinate with
Coordinate with the project design, installation details and acceptance criteria.
View source
Standard reference 06

AS 1720.1:2010 Amd 3:2018

Timber structures design methods

Issued by
Standards Australia
Published status
Current; project edition to be confirmed
Application
Australian timber-design framework for the responsible engineer.
Coordinate with
Pair with the specified structural plywood product and project fixing schedule.
View source
Standard reference 07

Voluntary Product Standard PS 1-22

Structural plywood

Issued by
NIST / US DOC
Published status
Current publication
Application
North American structural-plywood product standard requirements.
Coordinate with
Coordinate product identity with the project assembly and local acceptance requirements.
View source
Standard reference 08

PS 2-18 / APA Rated Sheathing guidance

Performance-rated wood structural panels and installation guidance

Issued by
APA
Published status
Current; exact edition to be confirmed
Application
North American performance-rated sheathing and installation option where specified.
Coordinate with
Match marks, span rating and values to qualified production and project documents.
View source
Standard reference 09

FSC-STD-40-004 V3-1

Chain of Custody certification

Issued by
FSC
Published status
Current
Application
Certified sourcing and transaction claims when requested and valid.
Coordinate with
Use alongside the structural product and performance specification.
View source
Standard reference 10

PEFC ST 2002:2020

Chain of Custody of Forest and Tree Based Products

Issued by
PEFC
Published status
Current
Application
PEFC chain-of-custody claims when requested and valid.
Coordinate with
Use alongside the structural product and performance specification.
View source
Standard reference 11

TSCA Title VI composite-wood formaldehyde programme

Regulatory scope option

Issued by
US EPA
Published status
Current
Application
Destination review for the exact plywood construction and applicable composite-wood category.
Coordinate with
Classify the product and destination before stating the applicable emission documents.
View source
Standard reference 12

Project-nominated fire test and classification

Finished product or assembly fire-performance requirements

Issued by
Project specifier
Published status
Project-specific
Application
Connects a fire-retardant plywood or finished-assembly requirement to the named method and specimen.
Coordinate with
Match substrate, treatment, finish, mounting and complete assembly to the stated classification.
View source
INSTALLATION TROUBLESHOOTING

Recognise common site problems and correct them before covering the assembly.

Structural plywood installation troubleshooting
Observed issueLikely causeProject impactCorrective action
Unsupported panel edgeJoint or cut-out misses framing or blockingLocal deflection, damage or loss of designed load transferShow every edge and opening on the support drawing before ordering and installation
Wrong face-grain directionSheet orientation is decided during installationDeclared direction-dependent properties may not match the calculationMark orientation on drawings, packs and first-installation inspection
Fastener pattern driftGeneric site habits replace the engineer's scheduleConnection capacity and diaphragm behaviour may changeProvide the current fixing plan and inspect the first completed area
Over-driven fastenersTool setting or substrate condition is uncontrolledFace damage, reduced head bearing or water entrySet tools, check seating and record corrective action
Insufficient edge distanceOpenings or field cuts crowd the fixing lineEdge splitting and weak connectionCoordinate cut-outs, framing and fixing zones before fabrication
Trapped construction moistureCovering proceeds before the panel and cavity drySwelling, mould risk, finish failure or dimensional movementMeasure and record the project moisture criterion before close-up
Standing waterDrainage or temporary protection is incompleteEdge wetting and prolonged saturationProvide drainage, remove water and reinspect affected areas
Unsealed site cutsCut edges, holes or damaged corners are left exposedMoisture reaches veneer edges and interfacesClean, dry and reseal with the specified compatible system
Material substitutionA visually similar sheet replaces the approved constructionProperties, bond, dimensions or project documents no longer matchVerify product identity, lot and documents at delivery
Missing scope membersDiaphragm or bracing details stop at the panel fieldThe load path is incomplete around edges or openingsEngineer the scope, collector and hold-down option
Membrane / flashing discontinuityInterfaces are not coordinated with sheathing installationWater enters the assembly despite a suitable panelInspect laps, penetrations and transitions before enclosure
Premature close-upInspection records are incompleteHidden defects cannot be corrected efficientlyUse a signed close-up approval checkpoints covering supports, fixes, moisture and protection
Uneven storage supportBearers are misaligned, too widely spaced or allow sheet ends to hangPanels can bow, twist or suffer local edge damage before installationStore flat, off ground and fully supported; check geometry before installation
Drawing revision not transferredPurchasing or installation works from a superseded issuePanel direction, openings, support or product documents can conflict with the current designMatch the purchase order, cutting file and site checklist to the current drawing revision
CONSTRUCTION DETAIL

Site inspection confirms the installed panel before the wall is covered.

Site inspector checking supported plywood wall sheathing, fasteners and framed openings before close-up
Plywood in useCheck product identity, face-grain direction, supported edges, fastener seating, openings, moisture, edge protection and the current project drawings.
SITE INSPECTION

Complete these checks before membranes, flooring or finishes cover the plywood.

  1. 01Current structural drawings, calculation assumptions and revisions are available.
  2. 02Panel identity, grade options, dimensions and lot documents match the approved submittal.
  3. 03Face-grain direction follows the structural drawing.
  4. 04All panel edges, joints and openings have the required support or engineered detail.
  5. 05Fastener type, corrosion protection, edge distance, spacing and seating match the schedule.
  6. 06Site cuts, holes and damaged corners follow the specified protection option.
  7. 07Membranes, flashings, penetrations and drainage interfaces are continuous.
  8. 08Construction wetting and panel moisture condition are within the project close-up criteria.
  9. 09Substitutions and batch changes have written project approval and matching product documents.
  10. 10The project inspector completes the installation checklist before the assembly is covered.
QUOTATION CHECKLIST

Send the drawings and purchasing details needed for a comparable quotation.

  1. 01Project and building type
  2. 02Assembly duty
  3. 03Structural system
  4. 04Responsible designer
  5. 05Project drawings
  6. 06Design loads / span input
  7. 07Support centres and layout
  8. 08Supported edges
  9. 09Face-grain direction
  10. 10Openings
  11. 11Fixing schedule
  12. 12Fastener corrosion option
  13. 13Exposure stage
  14. 14Final service environment
  15. 15Weather protection
  16. 16Site cuts and edge treatment
  17. 17Panel size
  18. 18Thickness
  19. 19Tolerance
  20. 20Required grade / properties
  21. 21Design standard / documents
  22. 22Destination
  23. 23Quantity
  24. 24Packing and site handling
  25. 25Delivery sequence
  26. 26Target date

Product: Structural Plywood · Destination: confirm in enquiry · Shipping term: recommended from destination and order details · Email: [email protected]

BUYER QUESTIONS

Practical answers for specifying construction plywood.

DECISION QUESTIONS

Before the purchase order

Choose the right specification.

What does construction plywood mean in a project specification?

Construction plywood is a practical category covering wall sheathing, roof decking, subfloors, bracing, temporary works and selected engineered components. A complete specification adds the structural product standard or declared-property option, grade, veneer construction, face-grain direction, thickness, support geometry, bond class, exposure, moisture target, dimensions and required project documents.

How is construction plywood different from Structural Plywood?

Construction plywood describes the intended building use, while Structural Plywood identifies the orderable panel constructions for projects that require named structural properties and controlled production. The application drawing defines loads, spans, supports, joints and fixings; the product specification defines the panel construction, grade, dimensions and accompanying documents.

Can wall sheathing, subfloor and roof decking use the same plywood configuration?

One configuration can serve several duties when the project designer confirms that its declared properties, thickness, orientation, supports, joints, openings, fastening, exposure and serviceability satisfy each assembly. Quotations should therefore list every intended duty instead of assuming that one sheet specification covers them automatically.

Who specifies support spacing, spans and fastener centres?

The project engineer or system designer sets these values from the design loads, panel properties, face-grain direction, framing geometry, connection design and governing code. CUZI PLY supplies the nominated panel construction, dimensions and product documents so they can be matched to that design.

What should a roof-sheathing specification include?

Include roof slope, rafter or truss spacing, supported edges, openings, wind and construction loads, face-grain direction, panel thickness, fastener type and spacing, expected wetting period, underlay, ventilation, drainage and the required structural product standard.

What should a plywood subfloor specification include?

Include joist spacing and bearing width, concentrated loads, deflection and vibration criteria, tongue-and-groove or blocked edges, openings, adhesive and fixing method, construction moisture, flatness, sanding allowance, finished-floor interface and the inspection point before covering.

What moisture range should be stated for construction plywood?

An 8–12% shipment moisture target is commonly specified for many dry export constructions. The final purchase requirement should match veneer species, panel construction, destination climate, transport duration and the condition expected at installation. Site acceptance should use the project's measuring method and close-up criterion.

How should site-cut edges, holes and damaged corners be protected?

Remove dust, allow exposed veneers to dry, then apply the specified compatible edge sealer or treatment to the required coverage. Pay particular attention to end grain, fastener penetrations and horizontal water traps, and check the repaired detail before membranes or finishes cover it.

How should temporary rain exposure be managed?

Plan a limited exposure period with wrapped delivery, raised storage, drainage, ventilation and prompt enclosure. After rain, remove standing water, allow even drying and check moisture, flatness, edge swelling and fastener seating before applying underlay, flooring or interior finishes.

What should be included in a construction plywood RFQ?

Send the building type, assembly duty, drawings, loads, support layout, face-grain direction, joints, openings, fixing schedule, exposure, bond and structural standard, dimensions, tolerance, moisture target, destination, quantity, packing, delivery sequence and required documents. These details allow the quotation to match both the panel and the installation plan.

Plywood enquiry

Tell us what you need.

Send assembly duty, drawings, loads, support and joint layout, face-grain direction, openings, fixing schedule, exposure, weather protection, edge treatment, panel dimensions, tolerances, property and document requirements, destination, quantity, sequence and target date. Our team will recommend the suitable Incoterm from the confirmed shipment details.

CHAT WITH CUZI PLY

By sending this request, you allow CUZI PLY to use the submitted details to respond. Read the Privacy Policy.