Should I compare formwork plywood by sheet price or cost per pour?+
Start with the specified panel and support system, then consider usable cuts, the required concrete finish, edge protection, cleaning and replacement. A cheaper sheet is not necessarily cheaper over the job. We can quote suitable constructions; the number of usable pours depends on the actual panel condition and site practice, not a fixed promise.
What should I send if my formwork specification is not final?+
Send the element being poured, the finish reference, panel dimensions, support spacing, expected site use, quantity and destination. Tell us which details are undecided. We can help compare plywood options while your formwork designer confirms pressure, supports, ties and fasteners.
Can I check a panel before committing to a container order?+
Request a panel reference for the proposed face, core, bond and thickness, and tell us whether you need a cutting, edge-sealing or trial-pour check. We confirm the available construction, preparation time and sample and courier costs before arranging it. Your quotation also confirms quantity, packing and production timing.
Who sets formwork support centres and concrete pressure?+
Your formwork designer sets supports, concrete pressure, ties, bracing and connections for the actual assembly. Our factory confirms the plywood construction, dimensions and specified product properties for that design. Film weight, colour or nominal thickness alone cannot define the system's capacity.
How many pours can film faced plywood complete?+
There is no single pour count for every job. Reuse depends on the selected panel, concrete mix, release agent, stripping, cleaning, cut-edge protection and storage. Inspect the film, edges, holes, flatness and bond condition before each next pour; replace a panel that no longer gives the required finish or meets the formwork specification.
How should site cuts, drilled holes and damaged corners be protected?+
Factory sealing protects the original edges. Newly exposed veneers should be clean and dry, coated promptly with a compatible waterproof edge-sealing paint, cured for the specified time and checked before concrete or weather exposure.
How is the correct film faced plywood selected for concrete formwork?+
Start with the concrete-finish reference and formwork drawing, then specify the film family and nominal weight, face/back arrangement, core and lay-up, exterior bond, thickness and tolerance, original edge seal, site-cut resealing, release agent and inspection plan. Film colour remains one appearance choice within that complete construction.
What happens after a panel is cut or drilled on site?+
The newly exposed veneers must be clean and dry, then promptly resealed with compatible waterproof edge-sealing paint to the specified coat, cure and inspection plan.
How do I agree the required concrete finish?+
Record the panel construction, release agent, concrete mix, form condition, pour and stripping conditions, then compare the result against a project-approved reference.
When should HDO/MDO be considered?+
Use the HDO/MDO option when the project drawing or finish specification names a high- or medium-density resin-fibre overlay, or when its defined overlay and concrete-finish reference suit the project better than phenolic film.
How should panels be stored between pours?+
Clean and dry them, stack flat on continuous aligned supports off the ground, protect them from rain while maintaining ventilation, and avoid trapped moisture or point loads.
How is EN 314 used in a formwork-plywood specification?+
EN 314 provides the plywood bonding-quality test and class option for the ordered panel construction. The formwork drawing separately defines supports, ties, pressure, bracing and joints, while the project finish reference and site plan define pouring, stripping, cleaning and reuse inspection.
What information starts a formwork plywood RFQ?+
Send the wall, slab, column or beam type; concrete-finish target; system drawing; support and joint layout; ties; panel sizes and thickness; cuts and holes; edge treatment; release agent; site cycle; quantity; destination; required documents and delivery date. We can then recommend the suitable panel construction and shipping basis.
How do I choose plywood for architectural concrete?+
Start with the exposed concrete finish, including texture, sheen, joint lines, tie-hole pattern and permitted marks. Compare a specified concrete-form HDO or MDO overlay with film-faced plywood using the intended concrete mix, release agent, supported layout and stripping method. A trial pour establishes the agreed finish reference. Keep faces, seams, edge protection and cleaning consistent across the work; the panel surface alone does not determine the complete concrete result.
What should I specify for plywood for precast concrete forms?+
Give the casting-bed or mould drawing, panel orientation, supports, joints, fixings and cut-outs, with finished dimensions, tolerances and the planned casting cycle. Include any heated curing, duration of wet exposure, concrete mix, release agent and cleaning method. We compare the plywood core, bond, overlay and edge protection for those conditions. Your mould or formwork design sets pressure, loading, supports and stripping requirements; a repeated precast cycle is not a fixed reuse guarantee.
Should I order full sheets or machined replacement panels?+
Full sheets suit changing site layouts and local cutting; allow for material yield, supported seams and resealing new cuts. For replacement panels, send the frame drawing and part schedule, finished thickness and tolerances, hole positions, reference edges, face orientation and quantities by part. We quote agreed cutting or drilling, edge treatment, part labels and protective packing separately from the panel. Check fit in the intended frame before a repeat order and keep the same drawing and construction reference.
What should a comparable formwork plywood quotation include?+
Compare the same core and veneer lay-up, bond class, face and reverse overlay, finished thickness, tolerances, sizes and quantities. State any named formply grade and required product reports, plus cutting, holes, edge coating, labels and packing. Your factory quote confirms the price unit, currency, minimum quantities, production timing, payment and named shipping term with its delivery point. Freight and transit time are separate from manufacturing; compare delivered cost and actual panel condition over the job rather than assuming a fixed cost per pour.