APA B360
Issued or governed by: APA – The Engineered Wood Association
HDO/MDO product characteristics, finishing and application context
Coordinate with: Project drawings for the installed sign, frame, fixings and wind capacity
View reference ↗BS EN 12899-1:2007
Issued or governed by: BSI / destination specification
Fixed vertical road traffic signs, sign plates and major sign-system components
Coordinate with: The approved substrate, temporary-sign rules, foundation and national project requirements
View reference ↗BS EN 636:2012+A1:2015
Issued or governed by: BSI
Plywood specification classes for dry, humid or exterior conditions where nominated
Coordinate with: The selected coating system and engineered support frame
View reference ↗BS EN 314-1:2004 / BS EN 314-2:1993
Issued or governed by: BSI
Bonding-quality test methods and requirements for the exact ordered construction
Coordinate with: The declared use class, face construction, finish and installed-sign assessment
View reference ↗BS EN 315:2000
Issued or governed by: BSI
Plywood dimensional tolerances and measurement option
Coordinate with: The finished machining tolerances and drawing datums stated in the order
View reference ↗BS EN 13986:2004+A1:2015
Issued or governed by: BSI
Construction-product characteristics, conformity evaluation and marking option when applicable
Coordinate with: The applicable construction use, complete sign specification and destination requirements
View reference ↗AS 1742 series and TfNSW supplement
Issued or governed by: Transport for NSW / responsible road authority
Australian traffic-control-device design option and NSW project supplements
Coordinate with: The authority-approved substrate and current project drawing
View reference ↗AS 1743:2023 and state supplements
Issued or governed by: Standards Australia / state road authority
Road-sign graphics, layout, dimensions, manufacture and jurisdictional supplement option
Coordinate with: The complete sign specification and approved sign-plate substrate
View reference ↗AS 1906.1:2017 / AS/NZS 1906.1:2017 destination requirements
Issued or governed by: Standards Australia / NZ Transport Agency / destination road authority
Road-sign retroreflective-sheeting performance requirements, using the Australian AS 1906.1:2017 redesignation after Amendment 1 and the AS/NZS 1906.1:2017 references retained in applicable New Zealand and authority documents
Coordinate with: The qualified panel blank, structural support, installed-sign approval and destination wording
View reference ↗Main Roads WA Specification 601
Issued or governed by: Main Roads Western Australia
Road-sign materials, manufacture and installation project requirements
Coordinate with: The specified sign-system material, fabrication and installation documents
View reference ↗MUTCD 11th Edition, Revision 1
Issued or governed by: US Federal Highway Administration
US traffic-control-device requirements and current edition context
Coordinate with: The state or project-approved sign-plate material and complete sign design
View reference ↗ASTM D4956-26
Issued or governed by: ASTM International / buyer specification
Retroreflective sheeting material for traffic-control signs and devices
Coordinate with: The selected ink, overlay, imaging method, substrate and complete-sign design
View reference ↗ISO 12465:2007
Issued or governed by: ISO / buyer specification
Plywood construction, bond, dimensions, conformance and marking option
Coordinate with: The project design values, support frame and installed-sign approval
View reference ↗FSC / PEFC transaction requirements
Issued or governed by: scheme authority and certificate holder
Chain-of-custody claims for an eligible transaction
Coordinate with: The covered transaction, valid certificate scope and approved claim wording
View reference ↗EUDR or destination due-diligence option
Issued or governed by: Destination operator / importer
Transaction and supply-chain due-diligence inputs when applicable
Coordinate with: The operator's legal assessment, due-diligence statement and project approval
View reference ↗Project drawings and complete-sign submittal
Issued or governed by: Project responsible party / authority
Permitted substrate, sign face, frame, wind design, installation and acceptance
Coordinate with: The panel specification, fabricator records, installation checklist and maintenance plan
PROJECT DOCUMENT